Engines on Rolls-Royce CorporateCare Enhanced
APU Enrolled on Honeywell MSP
Ka-Band Satellite Internet
Pre-Purchase Inspection Completed by Bombardier June 2026
13 Passenger Configuration
The Bombardier Global 6000 is equipped with an integrated, Collins Pro Line Fusion avionics suite.
Type of Unit | Quantity | Description |
Electronic Flight Instrument System | Four | Collins AFD-6520 |
Inertial Reference System | Triple | Honeywell |
Global Positioning System | Dual | Collins GPS-4000S |
Air Data Computer | Triple | Collins ADC-3020 |
Navigation Radio | Dual | Collins NAV-4000 |
Head Up Display | Single | Collins HGS |
Enhanced Vision System | Single | Collins EVS |
Synthetic Vision System | Single | Collins SVM-6110H |
VHF Communications | Triple | Collins VHF-4000 |
HF Communications | Dual | Collins HF-9031A |
Weather Radar | Single | Collins RTA-4118 |
Radar Altimeter | Dual | Collins ALT-4000 |
Transponder | Single | Collins TDR-94D |
Traffic Surveillance System | Single | Collins TSS-4100 |
Cockpit Voice Recorder | Single | L3 FA2100 |
Flight Data Recorder | Single | L3 FA2100 |
Emergency Locator Transmitter | Single | Artex B406-4 |
Lighting Sensor System | Single | Collins WX-1000E |
Number of Passengers Thirteen (13)
Galley Location Forward
Forward Cabin Configuration Four (4) Place Executive Club
Mid Cabin Configuration Four (4) Conference Group Opposite Credenza
Aft Cabin Configuration Two (2) Place Divan (Forward Seat Not Certified for taxi Take-Off or Landing Opposite Three (3) Place Divan (When removeable mid/aft cabin bulkhead is removed)
Lavatory Locations Forward Crew and Aft Executive
Crew Rest Forward
Jump Seat Yes
Last Refurbished Date
Original Completion
Bombardier Tucson – June 2026
Vinyl Flooring in Galley, Entry, and Forward and Aft Lav
New Cabin Carpet
Minor Woodwork Touch Ups
CONNECTIVITY & ENTERTAINMENT:
Display Monitors Forward and Aft Cabin Bulkhead
Cabin Management System Collins Venue
Internet Ka-Band and Swift Broadband
Base Paint Color White
Stripe Colors Blue and Gray
Last Paint Date Original Completion
MAJOR INSPECTION STATUS:
| Inspection | Last Performed | Next Due |
| 15 Month | June 2026 | September 2027 |
| 30 Month | November 2024 | June 2027 |
| 60 Month | November 2024 | December 2029 |
| 120 Month | – | December 2029 |